Project
SIEMENS/WELSH POWER SYNCHRONUS CONDENSER
Value
£3,000,000.00
DESIGN & CONSTRUCTION SCOPE
• Synchronus Condenser building constrution
• WPD Substation construction
• Firewall construction
• Equipment foundations
• Enabling & access roads
• High security fencing
• Electrical & lighting works
Project
SIEMENS KEADBY 2
Value
£3,800,000.00
DESIGN & CONSTRUCTION SCOPE
• 15000m2 Foundation & Slab break out including crushing
• 30000t Imported aggregates spread and level
• 17000m2 Cut & fill to cooling tower area to a depth of 1.50m
• 49000m2 Leveling of existing material to site install area
• 50000m2 Topsoil strip to whole site
• 5000m2 Breaking out for test pile area
• Supply of cabins,fencing,wheel wash & barriers for Siemens
Project
THORPE PARK HOLIDAY PARK
Value
£1,200,000.00
DESIGN & CONSTRUCTION SCOPE
• 10,000m3 earthworks
• 5,000m2 tarmac access roads
• 51No park home bases
• 3,500m kerbing & edging
• 2,000m foul & surface water drainage works
• 2,500m3 attenuation lake
• 13,000m2 turfing works
Project
THORNWICK BAY HOLIDAY PARK
Value
£970,000.000
DESIGN & CONSTRUCTION SCOPE
• 35,000m2 topsoil strip
• 70,000m3 earthworks to new lakes
• 25,000m2 GCL liner to lakes
• 25,000m2 geotextile protector to new lakes
• Pump station installation
• Retaining wall construction
• Drainage works
Project
SUNDOWN ADVENTURE LAND HOLIDAY PARK
Value
£1,850,000.00
DESIGN & CONSTRUCTION SCOPE
• 66No lodge foundations
• 20000m3 earthworks
• 7000m2 tarmac roads & car park
• 2No foul water pump stations
• 3000m kerbing & edging
• 3500m2 paving slabs
• 4000m foul & surface water drainage
Project
BRACKENBOROUGH LAKES HOLIDAY PARK
Value
£1,500,000.00
DESIGN & CONSTRUCTION SCOPE
• 17,000m3 topsoil strip
• 30No park home foundations
• 20,000m3 lake excavation
• 12,000m2 lake liner
• 7000m2 tarmac roads, drives and paths
• 4000m of kerbing and edging
• 1500m drainage works
Project
SIEMENS/NATIONAL GRID 400KVA SUBSTATION
Value
£970,000.00
DESIGN & CONSTRUCTION SCOPE
• 180No 16m long CFA piles
• 1000m3 reinforced concrete foundations
• 150t rebar
• 150m 600mm x 600mm cable trough
• Drainage, earthing & services site wide
• Electrical & lighting works
• Contractor compound construction
Project
WEST NEWTON B WELL SITE
Value
£625,000.00
DESIGN & CONSTRUCTION SCOPE
• 1500m x 5m wide access track
• 1.2m x 18m long culvert
• 3 No section 278 tarmac entrances
• 4000m3 of topsoil strip & earthworks
• 12000m2 drilling platform area
• 7000mm 1mm HDPE liner
• 2 No 3.0m diameter x 4.5m deep drilling cellar construction
Project
WRESSLE WELL SITE
Value
£300,000.00
DESIGN & CONSTRUCTION SCOPE
• Excavate, reprocess & lay 2500t slag
• 5000m2 2mm HDPE liner
• 10000m2 300g/800g m2 non woven geotextile
• 500m2 reinforced concrete access road
• 300m perimeter clean stone v ditch
• Drilling cellar & equipment foundations
• 450m2 spill retention tank bund
Project
SSE KEADBY 2 EARLY WORKS
Value
£1,900,000.00
DESIGN & CONSTRUCTION SCOPE
• 20000m2 reduced level excavation
• 1500m drainage & service trenches
• Demolition of existing stores & chp building
• HV & LV electrical/lighting works
• Steelwork & cladding for new lv workshop/store
• 2000m2 reinforced concrete slabs
• Fencing, fit out & turnstiles
Project
North Cave Anaerobic Digestion Plant
Value
£1,950,000.00
DESIGN & CONSTRUCTION SCOPE
• 500No precast concrete piles
• 5500m2 piling mat
• 350m x 3m high concrete retaining wall
• 4000m2 reinforced concrete slabs
• 2000m2 tarmac roads
• 250m3 attenuation tank
• 1100m drainage works
Project
Bonby Anaerobic Digestion Plant
Value
£2,400,000.00
DESIGN & CONSTRUCTION SCOPE
• 25,000m3 earthworks
• 7000m2 reinforced concrete slabs
• 300m x 4m high concrete retaining wall
• Electrical, fencing & cctv works
• 2000m drainage & ducting works
• De-packaging building
• 3000m2 tank foundations
Project
Lincolnshire Show Ground Car Park
Value
£250,000.00
DESIGN & CONSTRUCTION SCOPE
• 800m kerbing
• 5500m2 tarmac works
• 600m2 block paving
• 1500m drainage & ducting works
• Lighting & electrical works
• 1800m2 planing works
• White lining
Project
CLAAS DEVELOPMENT
Value
£1,050,000.00
DESIGN & CONSTRUCTION SCOPE
• 950m2 machinery workshop & parts store
• 300m2 double storey offices
• 150m2 sales display area
• 2000m2 reinforced concrete slabs
• 1500m2 machinery display area
• 950m2 tarmac works
• 750m kerbing & drainage workS
Project
MONKS DYKE TENNYSON COLLEGE
Value
£400,000.00
DESIGN & CONSTRUCTION SCOPE
• demolition and asbestos removal of quad building
• 3500m2 car park
• 1500m2 visitor car park and play area
• 400m drainage works
• 12No new lighting columns including electrical works
• 50m3 attenuation tank
• 300m fencing works
Project
WEETON WIND TURBINE
Value
£270,000.00
DESIGN & CONSTRUCTION SCOPE
• Full civils & electrical balance of plant works
• 11t reinforcement
• 113m3 concrete foundation
• 7000m2 access track & crane pad
• 278 entrance works
• 3000m cable & trenching to point of connection
• 8No continuous flight auger piles
Project
APPLE TREE YARD UTTERBY MANOR
Value
£200,000.00
DESIGN & CONSTRUCTION SCOPE
• 2000m3 earthworks
• 250m2 3m high retaining wall
• 190m3 reinforced wall & floor slab
• Surface & foul water drainage
• Voltex waterproofing to wall & slab
• Access road construction
• Service connections
Project
BARROW HOUSE
Value
UNDISCLOSED
DESIGN & CONSTRUCTION SCOPE
• Extensive cut and fill earthworks balance
• 99No 17m long 200mm square pre cast concrete piles
• 327m3 reinforced concrete
• 60m of 3m high reinforced concrete retaining walls
• Complex cantilever steel frame
• 6mm corten steel cladding system
• 190m2 bauder wild flower roof
Project
Hibaldstow Anaerobic Digestion Plant
Value
£1,400,000.00
DESIGN & CONSTRUCTION SCOPE
• 620m x 3.5m high concrete retaining wall
• 9000m2 tarmac silage clamp
• 5000m2 reinforced concrete slabs
• Attenuation ponds, swales & landscaped bunds
• 1500m2 reinforced concrete tank foundations
• 2000m2 tarmac access road
• 40000m3 below ground leachate tank
Project
BURRINGTON WIND TURBINE
Value
£230,000.00
DESIGN & CONSTRUCTION SCOPE
• Full civils & electrical balance of plant works
• 14t reinforcement
• 158m3 concrete foundation
• 5000m2 access track & crane pad
• 278 entrance works
• 500m cable & trenching to point of connection
• 8No pre cast concrete piles
Project
CLIXBY ANAEROBIC DIGESTION PLANT
Value
£900,000.00
DESIGN & CONSTRUCTION SCOPE
• 330m x 3.5m high concrete retaining wall
• 5000m2 tarmac silage clamp
• 3500m2 reinforced concrete slabs
• Swales & landscaped bunds
• 1500m2 reinforced concrete tank foundations
• 1000m2 tarmac access road
• 1500m drainage works
Project
BAKERCORP DEVELOPMENT
Value
£1,000,000.00
DESIGN & CONSTRUCTION SCOPE
• 200m2 single storey offices
• 500m2 tanker workshop
• 2200m2 reinforced concrete slabs
• 800m2 tarmac carpark & access road
• 3000m2 tanker storage area
• 100m2 wash bay
• 950m kerbing
Project
LITTLE SUTTON WIND TURBINE
Value
£270,000.00
DESIGN & CONSTRUCTION SCOPE
• Full civils & electrical balance of plant works
• 113m3 concrete foundation
• 14t reinforcement
• 3000m2 access track & crane pad
• 278 entrance works
• 8No pre cast concrete piles
• 500m cable & trenching to point of connection
Project
JUDKINS HOUSEHOLD WASTE RECYCLING CENTRE
Value
£1,050,000.00
DESIGN & CONSTRUCTION SCOPE
• Demolish existing building 120m x 20m
• 3000m2 tarmac roads
• 100m x 3m high concrete retaining wall
• 6000m2 reinforced concrete slabs
• 150m2 shop construction
• 200m3 attenuation tank
• 1000m drainage works
Project
GRIMSBY DOCKS DONG ENERGY & RES CAR PARK
Value
£210,000.00
DESIGN & CONSTRUCTION SCOPE
• 800m kerbing
• 2000m2 tarmac works
• Electrical & lighting works
• 278 entrance works
• 250m fencing & gates
• 300m duct trenching
• 500m drainage works
Project
FRANKLIN COLLEGE CAR PARK
Value
£240,000.00
DESIGN & CONSTRUCTION SCOPE
• Demolish existing business centre
• 3500m2 tarmac car park
• 250m2 tarmac cycle path
• 500m kerbing
• 600m drainage works
• Electrical & lighting works
• 150m fencing works