Project
FALCON CYCLES
Value
£450,000.00
DEMOLITION SCOPE
• 20000M2 Hard paving breakout
• 8500M2 Buildings demolished
• Asbestos removal throughout
• 1.5M Fill required over whole site
• Crushing & processing of 10000T of material
• Tree & vegetation removal
• DNO substation relocation
Project
COSALT BUILDINGS
Value
£225,000.00
DEMOLITION SCOPE
• Demolition of 3 large traditional brick structures
• Soft strip works throughout
• Full notifiable & non notifiable asbestos removal
• Breaking out existing concrete foundation and slabs
• Grubbing up drainage services to buildings
• Crushing & screening material
• Re use of crushed material for new hardstanding
Project
EAST WEST LINK ROAD LINCOLN
Value
£455,000.00
DEMOLITION SCOPE
• Demolition of buildings along East West link road route
• Soft strip works throughout
• Full notifiable & non notifiable asbestos removal
• Specialist demolition of Tentercroft Street Bridge
• Crushing & processing hardcore for new link road
• Bespoke concrete cutting and drilling works
• Breaking out existing concrete foundation and slabs
Project
GRIMSBY SLIPWAYS
Value
£550,000.00
DEMOLITION SCOPE
• Demolition of 2No winch houses, steel workshop & steel ship
• Breaking out existing slipway, causeway, jetty & piles
• Dredging works & removal of contaminated material
• Full notifiable & non notifiable asbestos removal
• Causeway construction
• Excavation of lagoon
• Reinforced concrete hoist beam construction
Project
LINCOLN HOSPITAL
Value
£200,000.00
DEMOLITION SCOPE
• Demolition of blocks 42 & 59
• Full notifiable & non notifiable asbestos removal
• Soft strip works throughout
• Demolition of blocks 53-56 & 65
• Crushing & screening material for re use
• Breaking out & removal of all foundations
• Construction of new car park area for hospital